16.3 C
New York

UK power capacity auction delivers 627 MW of battery storage – pv magazine International

Published:


Britain’s T-1 Capability Public sale for supply within the 2023-24 interval noticed battery power storage expertise emerge because the third largest winner when it comes to secured contracts, after fuel and nuclear. Batteries account for greater than half of recent building capability.

Britain’s T-1 Capability Public sale 2023-24 awarded contracts to 627 MW of battery power storage initiatives, up from 385 MW final yr. The Nationwide Grid stated in a provisional public sale doc {that a} complete of 5.78 GW was acquired. Of the 6.12 GW of capability auctioned, 94.42% of initiatives secured agreements for making provides accessible at brief discover.

The public sale closed at GBP 60 ($73.07)/kW per yr on Tuesday, representing the second highest clearing value to date, after the record-breaking value of GBP 75/kW per yr recorded final yr. Battery power storage initiatives accounted for 10.9% of the entire delivered capability, adopted by 2.6 GW of gas-fired energy vegetation and 1.4 GW of nuclear capability.

About four-fifths of the capability obtained within the public sale of 269 market capability models (CMU) from current energy property, the outcomes of the public sale present. Battery storage initiatives gained 74 contracts, and most of these will come from new building initiatives. Solely 60 MW of the 627 MW supplied capability will come from the present producing CMU. Of the brand new building capability that gained contracts, 54%, or 568 MW, got here from batteries, up from simply 261 MW final yr.

Almost half of all battery initiatives have a one-hour length, whereas about 40% are two-hour methods. The record of profitable storage builders contains Alkane Power, Conrad Power, Gore Road, Gresham Home, Gridserve, Concord, Infrared, Pivot Energy, Pulse Clear Power, SMS Power Providers, SUSI Storage, and Tagenergy UK.

Major capability auctions in Britain are normally held about 4 years earlier than the supply date, in so-called T-4 auctions. As much as 15-year contracts can be found for new-build capability in these auctions, whereas current capability can solely safe one-year contracts. Different auctions for a small quantity of capability, the so-called T-1 auctions, are normally held a yr earlier than supply, with one-year contracts for takeover.

This content material is protected by copyright and will not be reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: [email protected]



Source link

Related articles

spot_img

Recent articles

spot_img