The municipality of Aradippou, a city outdoors Larnaca, Cyprus, has launched a young to pick an engineering, procurement and development (EPC) contractor for a 2.96 MW photo voltaic plant.
Potential builders have till Could 12 to submit their bids. Development is predicted to be accomplished inside 15 months. The funding within the venture is estimated at €3.37 million ($3.67 million), plus valued added tax. Financing might be offered by the Thalia 2021-27 program in Europe.
“Aradippou is as soon as once more main the way in which, making a venture that may give environmental in addition to financial life to our metropolis,” stated the mayor of Aradippou, Evangelos Evangelides.
The newest statistics from the Worldwide Renewable Vitality Company (IRENA) present that Cyprus could have 464 MW of cumulative photo voltaic installations by the tip of 2022.
This content material is protected by copyright and will not be reused. If you wish to cooperate with us and need to reuse a few of our content material, please contact: [email protected].