From pv journal Australia

ACEN Australia, the Australian unit of Philippine-based clear vitality firm AC Power, is ready to put in Australia’s largest battery at 1.4 GW / 2.8 GWh close to Uralla, in northern New South Wales.

The corporate says the New South Wales authorities has authorized its plans to extend the scale of the New England battery from 200 MW/400 MWh to a model seven instances bigger. The battery can be positioned subsequent to ACEN Australia’s 720 MW (AC) New England Photo voltaic Farm. The primary 400 MW part of the photo voltaic farm was opened in March.

The expanded battery stays inside the authorized website boundary, utilizing extra land for development functions, in accordance with ACEN Australia. The chosen location close to the substation permits the connection to the electrical energy transmission community. ACEN Australia’s restructuring plans for the second part of the photo voltaic venture embody unspecified modifications aimed toward optimizing the venture and progressing in the direction of development.

This content material is protected by copyright and is probably not reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: [email protected].