Maxeon has accomplished a $70 million renovation challenge to convey the capability of its module plant in Mexicali, Mexico, as much as 1.8 GW. The module plant improve plan was first reported by pv journal two years in the past.
Maxeon additionally has a second manufacturing unit in Ensenada, in the identical state of Baja California. The mixed capability of its two module crops in Mexico is 2.5 GW, with about 2,000 staff.
The corporate mentioned in an announcement that it has made cumulative investments of greater than $260 million within the area. It claims its Mexicali location is now one of many “largest photo voltaic panel manufacturing amenities” in America.
“Due to its gifted workforce, its privileged geographic location, and a positive enterprise atmosphere, as we speak Baja California performs and can proceed to play an more and more necessary position in assembly the rising demand for our merchandise in North America and the remainder of the world within the coming years,” mentioned Maxeon CEO Invoice Mulligan.
This content material is protected by copyright and will not be reused. If you wish to cooperate with us and need to reuse a few of our content material, please contact: [email protected].