From pv journal LatAm
The Ministry of Power of Argentina introduced the outcomes of the Renewable Power Era Tender RenMDI2 program. It initially deliberate to allocate 620 MW of technology capability.
The ministry mentioned it has chosen 98 tasks with a complete of 633.7 MW for procurement, with 501.1 MW of PV distributed amongst 44 tasks. The remaining capability comes from a ten MW wind farm, 3 MW biomass undertaking, 29.9 MW of biogas crops, 39 MW of biomass crops, and 19 small hydroelectric tasks (PAH) equal to 37.5 MW.
Photo voltaic tasks might be distributed all through the provinces of Buenos Aires, Catamarca, Chaco, Córdoba, Corrientes, Formosa, La Pampa, La Rioja, Mendoza, Misiones, San Juan, Santa Fe and Santiago del Estero.
Successful bids will safe 15-year provide contracts with Cammesa, the corporate that manages the nation’s wholesale electrical energy market.
The procurement train is the nation’s first public tender for renewable vitality since 2019. That yr, Argentina held the third section of its “RenovAr” public tender, with a minimal worth of $54.22/MWh.
This content material is protected by copyright and is probably not reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: [email protected].